VJ Technology Case Studies

VJT Technology have been involved in a range of high profile projects over recent years, from the refurbishment of Hastings Pier to the emergency repairs at the Dawlish Flooding site.

After receiving a substantial order by Amalgamated Construction Ltd, VJT were able to supply and deliver every item ordered before 9am the following day. The site was the Dawlish rail flooding disaster, and due to the quick reaction time of the VJT team, contractors were able to continue to work tirelessly to get the railway back in safe working order quickly.

The traditional method of using slow curing mortar was considered inefficient by project managers. The risk of overrunning and potential added cost of line closer were considered major problems and were avoided completely with the help of VJT.

VJ Technology Demo Videos

At VJ Technology, we are equipped with a purpose built in-house Test Laboratory that allows us to continually produce innovative products designed to improve the everyday working environment of the construction industry, as well as demonstrate how vital health and safety measures are in the work place.