£370 million Twin Bore Road Tunnel
Anchors were supplied to the Civils Team for the construction of the new road tunnel: initially these were temporary fixings for ventilation and electrical services to support the TBM and early construction, but later specific fixing problems were solved…
- A specialist system involving a shear pin was developed to fix and support a secondary concrete lining. This value engineered system precluded the requirement for resin anchors and allowed the backfilled mortar to be injected/ poured immediately. The VJT system improved productivity 6 fold.
- VJT identified and tested a suitable anchor for fixing the ‘shotcrete’ containment. The special undercut anchor has an approval for cracked concrete and fire resistance, and displayed no displacement at the required proof loads.
- Installation was 4 times faster when compared to the system originally specified.
- Site Testing: all anchors were tested for suitability and workmanship using specially designed equipment from the VJT laboratory.
- For durability and performance the FHB-DYN anchors were supplied in stainless steel (High Corrosion Resistant 1.4529) and full material certification was provided.