VJT Case Study - Network Rail Thameslink Project

Fixing Catenary to Masonry Lined Tunnels

  • The traditional method, using M16 anchors in a slow curing mortar, was considered inefficient. The risk of ‘project overrun’ and the potential additional cost of line closure for extended line possession were of concern. A more efficient method was therefore required.

  • VJT ‘value engineered’ a system that allowed the brackets to be fixed in less than 10 minutes; which compared to 1 hour using the original system.

  • 600% more productivity.

  • Reduced risk of ‘over run’ and associated line closure costs.

  • Simple, consistent and, therefore, safer fixing system

  • Extensive testing was undertaken to prove that the system had sufficient capacity and durability for the application

 

Further Information

Fixings, Cavity Wall Fixings, Scaffolding Fixings,

Drill Bits, Saw Blades

Nails, Screws, Caps

Bolts, Nuts, Studding, Washers

Sealants, Adhesives

Fillers, Paints, Markers, Oil & Grease

Diamonds & Abrasives

Joist Hangers, Wall Ties, Lath & Bead

Ironmongery

Chain, Lifting & Banding

Britclip & Unistrut

Lindapter & Hollobolts

Cable Ties & Clips

Safety & Cleaning

Power Tools & Accessories

Hand Tools